Pedrollo Pressure Boosting Sets, 5.5kW, 1000L/min, CB2-F32/200B

Pedrollo Pressure Boosting Sets, 5.5kW, 1000L/min, CB2-F32/200B

    Pedrollo Pressure Boosting Sets, 5.5kW, 1000L/min, CB2-F32/200B

    Product Code: CB2-F32/200B
    Availability: In Stock
    Loading ...
    Share:

    Model: CB2-F32/200B (Two Single-stage Centrifugal Pumps)

    Price inclusives 6%GST.

    Description

    • COMBIPRESS are twin pump sets for water pressurisation, with a range to suit the requirements of domestic, civil agricultural and industrial applications.

    Principle of Operation

    • COMBIPRESS pressure booster sets are pre-assembled ready for installation.
    • The sets operate as "duty-assist", with one or both pumps starting automatically in succession as demand for water increases.
    • This system is enery efficient as it only starts the pumps necessary to meet the demand.
    • The lead pump is alternated automatically by the control panel.

    Use
    Clean water and chemically non aggressive liquids:

    • Water Supply: pressure boosting for industry, condominiums, hotels, communities, water treatment plants, camping sites, schools, hospitals, barracks, etc.
    • Irrigation: football and sports, grounds, golf courses, agriculture and artical snow systems.

    Construction Characteristics

    • PUMPS complete with suction  and delivery manifolds, ball valves and non-return valves.
    • BASE made of powder-painted metal sections.
    • Control systems PRE-INSTALLED on the delivery manifold, comparising of pressure gauge, connection for pressure vessel (not supplied), and two user adjustable pressure switches. The factory settings are shown in the following tables.
    • CONTROL PANEL with door interlocked power switch, low voltage pressure switch control circuit, automatic pump changeover, thermal motor protector and "anti-bounce" system to ensure that the pumps run for an acceptable period once started.
      • CB2m: Single Phase 230V - 50Hz including capacitor, and with integral thermal overload protection.
      • CB2: Three Phase 230/400V - 50Hz up to 4kW
                                          400/690V - 50Hz from 5.5 to 18.5kW

    Specifications

    Power   5.5 + 5.5 kW
    Phase Three Phase
    Max. Flow Rate 60.0 m³/h
    Head 54 m
    Max. Head 1000 L/min
    Pressure Switch Factory Setting (1 bar)    

    3.5 ÷ 4.5

    Pressure Switch Factory Setting (2 bar) 3 ÷ 4          

    You May Like